PLUS MALAYSIA BERHAD

Media Releases
Laman Utama > Media > CONTRA FLOW ON LINKEDUA

CONTRA FLOW ON LINKEDUA

Traffic Management

Projek Lebuhraya Usahasama Berhad (PLUS) wishes to inform that a contra flow will be activated at KM5.1 to KM6.3 between Gelang Patah and Tanjung Kupang Toll Plaza on the Linkedua highway on 20 June to 23 June, from 10:00 pm to 5:00 am.

The contra flow is aimed at facilitating a beam launching work for the Coastal Highway Southern Link (CHSL).

As such, drivers are advised to follow all traffic signages and instructions given by PLUS personnel at the area.

PLUS thanks all drivers for their attention and co-operation.

For further details, please contact the PLUSLINE at 1800 88 00 00


LALUAN KONTRA DI LINKEDUA

Projek Lebuhraya Usahasama Berhad (PLUS) ingin memaklumkan laluan kontra di KM5.1 hingga KM6.3 di antara Gelang Patah ke Plaza Tol Tanjung Kupang di Lebuh raya Linkedua akan dijalankan pada 20 Jun hingga 23 Jun, bermula jam 10:00 malam hingga 5:00 pagi.

Ini bagi membolehkan kerja-kerja pemasangan rasuk jambatan bagi kerja-kerja pembinaan laluan Coastal Highway Southern Link (CHSL) dilaksanakan di laluan terbabit.

Sehubungan itu, PLUS menasihatkan semua pemandu yang menggunakan laluan tersebut supaya mematuhi semua papantanda serta arahan yang diberikan.

PLUS mengucapkan ribuan terima kasih di atas perhatian dan kerjasama semua pemandu.

 
PLUSLine: 1-800-88-0000
Toll Rates

plusmiles

 

 

icon-twitter

 twitter @kembara plus

 

 

travelsmarter