Media Centre

Your hub to our latest news and announcements.

Our Video

Filter

  • Filter by year

Categories

10 Feb 2026 / Media Release

ACTIVATION OF CONTRA FLOW BETWEEN PUTRAJAYA – BANDAR SAUJANA PUTRA, KM19.5-KM18.0 AND BANDAR SAUJANA PUTRA – PUTRAJAYA, KM18.0-KM19.5 ON THE ELITE HIGHWAY FOR BRIDGE CONSTRUCTION WORKS

Petaling Jaya, 10 February 2026:- PLUS Malaysia Berhad (PLUS) wishes to inform that a contra flow will be activated between Putrajaya and Bandar Saujana Putra, KM19.5 to KM18.0 on 10 February to 11 February 2026 from 11.00 pm to 5.00 am and between Bandar Saujana to Putrajaya, KM18.0 to KM19.5 on 11 February to 12 February 2026 from 11.00 pm to 5.00 am on the North-South Expressway Central Link (ELITE) for bridge construction works by the
appointed contractor.

9 Feb 2026 / Media Release

PLUS GEARS UP FOR 2.2 MILLION VEHICLES THIS CHINESE NEW YEAR

Petaling Jaya, 9 February 2026:- PLUS Malaysia Berhad (PLUS) anticipates an increase in traffic up to 2.2 million vehicles daily during peak days across the highway network in conjunction with the upcoming Chinese New Year. This is an increase of 16 percent compared to daily traffic volumes on the PLUS-operated highways. The projected peak days on the PLUS highway network are 12, 13 and 14 of February 2026 for travel outside of the Klang Valley, and 20, 21 and 22 February 2026 for the return journey to the Klang Valley.

6 Feb 2026 / Media Release

USE MYPLUS-TTA TO PLAN FESTIVE HIGHWAY TRAVEL TO USHER IN CHINESE NEW YEAR AND RAMADAN

Petaling Jaya, 6 February 2026:– In conjunction with the upcoming Chinese New Year celebrations, which coincides with the commencement of the month of Ramadan, PLUS Malaysia Berhad (PLUS) anticipates a significant increase in traffic volumes along several major stretches across its PLUS-operated highways, including the Lebuhraya Pantai Timur 2 (LPT2).

6 Feb 2026 / Media Release

TRAFFIC DIVERSION FOR BEAM INSTALLATION WORKS AT THE JOHOR LANE WIDENING CONSTRUCTION PROJECT ON THE NORTH-SOUTH EXPRESSWAY FROM YONG PENG (NORTH) TO SENAI (NORTH)

Petaling Jaya, 6th February 2026:- The construction of the additional lanes on the North-South Expressway from Yong Peng (North) to Senai (North) is actively progressing as part of efforts to provide more comfort and convenience for highway users in the future. The widening works also involve several bridges crossing the highway mainline along the Kulai–Sedenak stretch.

20 Jan 2026 / Media Release

MAINTENANCE WORKS ON OVERHEAD ELECTRICAL LINES ALONG THE STRETCH BETWEEN SUNGAI BUAYA AND RAWANG CROSSING PLUS HIGHWAY AT KM443.2 (SOUTH BOUND)

Petaling Jaya, 20 January 2026:- PLUS Malaysia Berhad (PLUS) wishes to inform the maintenance works on overhead electrical lines will be carried out along the stretch between Sungai Buaya and Rawang Interchange at KM443.2 (Southbound) crossing the North-South Expressway (NSE) on 21 January (Wednesday) to 23 January 2026 (Friday), from 10.00am to 4.00pm daily throughout the period by Tenaga Nasional Berhad (TNB).

17 Jan 2026 / Media Release

MYPLUS COMMUNITY DAY BENEFITS 138,255 COMMUNITIES ALONG THE HIGHWAY – CSR Initiative Expanded with the Involvement of 5 MADANI Adopted Schools

Klang, 17 January 2026: With the theme “Empowering Safe and Sustainable Communities,” the 9th edition of the MyPLUS Community Day corporate social responsibility (CSR) programme has benefited a total of 138,255 community members along the highways operated by PLUS Malaysia Berhad (PLUS) since its inception in 2013.

1 Aug 2025 / Events

Terms and Conditions of “Peraduan Teroka Malaysia Bersama PLUS”

30 May 2025 / Events

LOKASI PENGAKTIFAN SMART LANE DI LEBUHRAYA PLUS SEPANJANG MUSIM PERAYAAN HARI RAYA AIDILADHA 2025

25 Mar 2025 / Events

LOKASI PENGAKTIFAN SMART LANE DI LEBUHRAYA PLUS SEPANJANG MUSIM PERAYAAN HARI RAYA AIDILFITRI 2025

15 Mar 2025 / Events

LARANGAN KENDERAAN BERAT: KENDERAAN KELAS 2 & 3 DILARANG MASUK LEBUH RAYA PADA WAKTU PUNCAK DI LALUAN TERPILIH KE/DARI KL. RANCANG PERJALANAN, GUNA LALUAN ALTERNATIF & ELAK PARKIR TERLARANG.

23 Jan 2025 / Events

LOKASI PENGAKTIFAN SMART LANE DI LEBUHRAYA PLUS BAGI WILAYAH UTARA DAN TENGAH BERMULA 23 JANUARI 2025 HINGGA 2 FEBRUARI 2025 SEPANJANG MUSIM PERAYAAN TAHUN BAHARU CINA

19 Dec 2024 / Events

LOKASI PENGAKTIFAN SMARTLANE DI LEBUHRAYA PLUS DARI 20 DISEMBER 2024 HINGGA 2 JANUARI 2025 SEPANJANG MUSIM PERAYAAN KRISMAS DAN CUTI HUJUNG TAHUN

No events currently available

Keep an eye out for updates to stay up-to-date on everything happening at PLUS Malaysia.

Are you a media practitioner?

Speak to our Media Liaisons!

Stay up to date with PLUS Malaysia

Explore PLUS’ employees perks, learn about our ethical commitments, and access the latest news and updates.

PLUS Malaysia Berhad
A leading expressway operator continuously reshaping national landscape.
Warga MyPLUS
Meet our team of dedicated professionals tirelessly working to ensure your safety.
Institutionalizing Good Governance
Policies, frameworks and codes which outline our commitment to upholding good governance.
PLUS Malaysia Berhad
A leading expressway operator continuously reshaping national landscape.
Warga MyPLUS
Meet our team of dedicated professionals tirelessly working to ensure your safety.
Institutionalizing Good Governance
Policies, frameworks and codes which outline our commitment to upholding good governance.